32 calculators

Concrete planning tool

Concrete Bell Footing Calculator

Estimate the concrete for round bell footings: a cylindrical pier on a flared, cone-shaped bell. Enter the pier and bell sizes from your plans or the form maker, the number of footings, and a waste allowance.

01

Pier and bell size

Enter the footing size, count, and waste

Measurement system

Pier diameter: Inside diameter of the tube or hole.

Pier height above the bell: From the top of the bell to the top of the pier. Enter 0 for a bell with no pier.

Bell base diameter: Across the bottom of the bell.

Bell height: From the bottom of the bell to where it meets the pier.

02

Concrete required

Concrete volume for the footings

Enter the pier and bell sizes to see your result

Use the sizes from your plans, the form maker, or the dug hole to calculate the concrete volume for your footings.

How it works

From pier and bell sizes to concrete volume

Quick answer

The calculator adds a cylinder for the pier and a cone with its top cut off for the bell, multiplies by the number of footings, and adds your waste allowance.

Concrete bell footing formula

Pier volume = π ÷ 4 × Pier diameter² × Pier height

Bell volume = π × Bell height × (Base diameter² + Base diameter × Pier diameter + Pier diameter²) ÷ 12

Concrete = (Pier volume + Bell volume) × Number of footings × (1 + Waste ÷ 100)

The bell is a round cone with its top cut off: its top is as wide as the pier and its bottom is the bell base diameter. The formulas use one unit for every size, so the calculator converts the pier height from feet to inches (× 12), divides the cubic inches by 1,728 to get cubic feet, and divides cubic feet by 27 to get cubic yards.

Worked example: 10 in pier 4 ft high on a 22 in bell 12 in high, 6 footings, 10% waste

  1. Calculate the pier volumeπ ÷ 4 × 10² × (12 × 4) = 1,200π ≈ 3,769.91 in³
  2. Calculate the bell volumeπ × 12 × (22² + 22 × 10 + 10²) ÷ 12 = 804π ≈ 2,525.84 in³
  3. Add them and convert to cubic feet2,004π ÷ 1,728 ≈ 3.6434 ft³ per footing
  4. Multiply by the number of footings6 × 3.64337… ≈ 21.8602 ft³
  5. Add 10% waste21.86024… × 1.10 ≈ 24.05 ft³
  6. Convert to cubic yards24.04627… ÷ 27 ≈ 0.89 yd³

Estimate limitations

This calculator estimates concrete volume for identical round bell footings, each a cylindrical pier on a bell shaped like a cone with its top cut off. Square, pyramid-shaped, or stepped forms and bells with straight-sided bottoms hold a different volume; use the form maker's stated volume where one is given. It does not subtract rebar, anchors, or embedded posts, and over-digging and spillage are covered only by the waste allowance. It does not determine footing size, depth, frost depth, soil bearing capacity, reinforcement, or code compliance.

Use project plans, local requirements, and qualified professional guidance where required.

Frequently asked questions

What is the pier height above the bell?
It is the height from the top of the bell to the top of the pier. Enter 0 for a bell with no pier.
Does it work for square, pyramid, or stepped footing forms?
No. It treats the bell as a round cone with a flat top and bottom. Square, pyramid-shaped, or stepped forms, and bells with straight sides at the bottom, hold a different volume. Use the form maker's stated volume where one is given.
Can it calculate concrete bags?
Use the Concrete Bag Calculator with this volume and the product's listed yield.
Does it tell me what size or depth of footing I need?
No. It only estimates concrete volume and recommends no pier or bell size, depth, or reinforcement. Use project plans, local requirements, and qualified professional guidance where required.
Can I use Metric units?
Yes. Metric mode accepts the diameters and the bell height in centimeters and the pier height in meters, shows the volume in cubic meters, and keeps the same physical values when you switch.
How is the waste allowance applied?
It is added to the volume of all the footings together. The right allowance depends on your project, so no percentage is recommended.
Does it subtract rebar, anchors, or posts set in the concrete?
No. It calculates the full volume of each footing and does not subtract anything set into the concrete.